PYMBLE LADIES’ COLLEGE – GREY HOUSE PRECINCT (GHP)

PPC commenced this project in an advisory role assisting Pymble Ladies’ College in 2021 as the chair of the project PCG. In July 2022, our role was extended to Project Management of the project through to the Head Contractor procurement, Authority Approval close out and as Site Superintendent delivering the project over a 24-month period.

The GHP project involved construction of a five-storey building to accommodate the following:

  • Junior school classrooms for years 5 and 6;
  • Science, technology engineering and mathematics laboratory;
  • Health and wellbeing facilities;
  • A dance academy;
  • Out-of-school-hours care;
  • A new Early Learning Centre (ELC) for 90 children (0-5 years) and 20 staff;
  • Landscaping with Play Equipment;
  • Outdoor learning spaces for existing students.

A key aspect of PPC’s role was working with the College and the Contractor to manage the delivery of the project located within close proximity of existing operations of the College to avoid disruption, and ensuring the design intent was maintained for internal spatial and landscaped areas as inspiring multi-functional, flexible, accessible, and safe areas for students and staff.

  • CLIENT

    PYMBLE LADIES' COLLEGE

  • LOCATION

    PYMBLE, NSW

  • PROJECT VALUE

    CONFIDENTIAL

  • PROJECT TYPE

    Education,

  • OUR ROLE

    Project Management
    Site Superintendent

  • PROJECT TIMELINE

    Commenced 2021 – Completed January 2026